| Équinoxe
Tremblant
Construction
of luxurious residences in a rustic environment
Year
of realization: 2000-2001
Cost
of construction :
28,8 millions $
Number
of units :
91 luxurious units
Particular challenge
posed by this project:
The construction of these very luxurious mountainside units necessitated
the extraction of 65000 cubic meters of solid rock, at a 30 %
slope. This situation raised preservation concerns for the integrity
of the natural habitat and the environment. |